Stonecliffe Action Park
Stonecliffe Action Park
PLEASE NOTE: STONECLIFFE ACTION PARK IS CURRENTLY CLOSED
PLEASE BE ADVISED AS OF JANUARY 16, 2025, STONECLIFFE PARK, INCLUDING THE ACTION SKATEPARK, AND THE COLUMBIA STREET PARKING LOT WILL BE CLOSED DURING CONSTRUCTION OF THE CITY OF READING'S SEWER FORCE MAIN PROJECT.
Action Park
Stonecliffe Action Park at Stonecliffe Recreation Area, is an Action Park for skaters, BMX bikers, and scooters.
Skates include in-line skates, skateboards and scooters. Bikes include BMX-style bikes only.
Stonecliffe Action Park includes two hipped Quarter Pipes that range in height from 4’-5', a Three-sided Pyramid with a Flat Grind Rail, a hipped bank feature about 4’ in height, a Loading Dock with Bank roll up, two Rectangular Kinked Grind Rails, a Straight Round Grind Rail, a 3' Spine ramp, 4 Grind Ledges- 2 with 2" square coping, 2 with recycled plastic edges, and one manual pad. There are also two seating areas for spectators.
Directions
From Route 183 South (Schuylkill Ave.)
To Lower Lot: (Next to Action Park) Turn right onto Columbia Street (before bridge into city). At T intersection, turn left onto Butler Street. Follow curve in road. The road is now Columbia St. again. At the end of the street is the Parking Lot. (You must go to the right to enter. There should be arrows on the pavement.)
Action Park Sponsors:
Sovereign Bank
Leesport Bank
Reading Pre-Cast
Tony Hawk Foundation
Friends of Nathan Schneck
Amity Fence
Jay's Rails & Fabrication